Pre Planning / SuDS Case Study -Staffordshire

11 Plot residential development on a brownfield site in Flood Zone 3

  • Incorporation of a combination of SuDS features including Permeable Paving and a detention basin providing a level of treatment to the surface water and amenity value to the development

  • Diversion of an existing combined sewer through the site

  • Significant liaison with the LPA to have the drainage system approved